{"id":3247,"date":"2025-09-27T00:15:27","date_gmt":"2025-09-27T03:15:27","guid":{"rendered":"https:\/\/cbrr.org.br\/_profissionais\/019045\/"},"modified":"2025-09-27T00:15:27","modified_gmt":"2025-09-27T03:15:27","slug":"019045","status":"publish","type":"profissionais","link":"https:\/\/cbrr.org.br\/en\/_profissionais\/019045\/","title":{"rendered":"019045"},"content":{"rendered":"<p>Generalist mining engineer (UFOP\/EMM-1977), solid knowledge and relationships throughout the mineral chain, with MBA Projects FGV- PMI\u00ae, Mine Safety\/JICA, PQ\/CBRR in Resource Estimation, Reserves and Mining Operations, several feasibility and risk studies, for gold, metallic, energy mineral and industrial projects.<\/p>","protected":false},"featured_media":3248,"template":"","area-de-atuacao":[17,18,22],"class_list":["post-3247","profissionais","type-profissionais","status-publish","has-post-thumbnail","hentry","area-de-atuacao-estimativa-de-recursos-minerais","area-de-atuacao-estimativa-de-reservas-minerais","area-de-atuacao-operacoes-de-mineracao"],"_links":{"self":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/profissionais\/3247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/profissionais"}],"about":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/types\/profissionais"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/media\/3248"}],"wp:attachment":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/media?parent=3247"}],"wp:term":[{"taxonomy":"area-de-atuacao","embeddable":true,"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/area-de-atuacao?post=3247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}