{"id":3636,"date":"2025-09-27T00:17:00","date_gmt":"2025-09-27T03:17:00","guid":{"rendered":"https:\/\/cbrr.org.br\/_profissionais\/025244\/"},"modified":"2025-09-27T00:17:00","modified_gmt":"2025-09-27T03:17:00","slug":"025244","status":"publish","type":"profissionais","link":"https:\/\/cbrr.org.br\/en\/_profissionais\/025244\/","title":{"rendered":"025244"},"content":{"rendered":"<p>Mining Engineer (UFCG \u2013 2002), Master in Engineering (UFRGS \u2013 2014), with over 22 years working in the mineral industry, in open pit operations, in the areas of mine operations, geotechnics, short and long-term planning, reserve estimation and annual depletion for cement and iron ore.<\/p>","protected":false},"featured_media":3637,"template":"","area-de-atuacao":[18],"class_list":["post-3636","profissionais","type-profissionais","status-publish","has-post-thumbnail","hentry","area-de-atuacao-estimativa-de-reservas-minerais"],"_links":{"self":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/profissionais\/3636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/profissionais"}],"about":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/types\/profissionais"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/media\/3637"}],"wp:attachment":[{"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/media?parent=3636"}],"wp:term":[{"taxonomy":"area-de-atuacao","embeddable":true,"href":"https:\/\/cbrr.org.br\/en\/wp-json\/wp\/v2\/area-de-atuacao?post=3636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}